Determine 28.nine presents a graph from an ER corrosion probe installed at this downstream spot and used to measure the corrosion fees. The initial slope illustrates the baseline corrosion fees. The vertical line over the left marks time when corrosion inhibitors had been to start with injected. (The inhibitors had been utilized repeatedly, rather